Air conditioning for hospitals
Exploitation of geothermal energy for summer and winter air conditioning of the "Morrone" Diagnostic Center in Caserta
Centro Morrone, is a health care company recognized as an excellence in health care in the Campania region (Italy) thanks to the cutting-edge technologies with which it is equipped, the attention to the patient that characterizes it, and the high levels of comfort and organization.
The challenge
In 2023, the ownership decided to equip it with a centralized thermo-cooling plant that would take advantage of geothermal technology to replace the air-cooled heat pumps that covered the thermal needs of the different areas of the center.
This intervention aimed to:
- equip the facility with a centralized system that would allow simpler and more rational management of the building's thermal needs
- increase plant efficiency and consequently lower operating costs
- satisfy simultaneous and opposite air conditioning needs
The solution
The adopted solution is based on ELFOEnergy Ground Medium² MF WSHN-XEE2 MF 80.2 multifunctional water-to-water geothermal heat pumps with cascade operation, automatically driven by the thermal cooling energy needed by the system. The heat pumps have a 4-pipe configuration to simultaneously meet the needs for hot water and chilled water.
The results
The use of the stable temperature water from the underground basins as an exchange source has increased the performance of the heat pumps compared to the pre-existing system, lowering consumption and operating costs.
In addition, as these units do not have fans, they are extremely quiet.
The end result was a decrease in consumption of more than 60 % compared to the previous system.
Technical data
Installed KW: 800 KW thermal
Maximum cooling capacity: 270 kW
Maximum thermal capacity: 314 kW
Thermal recovery capacity: 280 kW
Protagonists
Client: Centro Morrone S.r.l.
Plant design: LAV.EL. Power S.r.l. in collaboration with Ing. Vincenzo Russo
Plant installation: LAV.EL. Power S.r.l.
Clivet Agency: Eugenio Nini
Clivet units installed
3x ELFOEnergy Ground Medium² MF WSHN-XEE2 MF 80.2
This website uses cookies, including third party ones, to enable website operations, for statistics, to improve your navigation experience and personalise the communications sent to you. You may accept these cookies by clinking on “Accept all” or clicking on “Preferences" to personalise your choices. On closing the banner without accepting, the website will only use technical cookies (needed for the website to operate).